Yandi Project

Yandi Project Design included mechanical design, control design, commissioning, and chute designs(2).

Año de construcción: 2003
Ubicación: Yandi Ore handling – Pibara, Australia
Length : 5.1 km
Potencia: 2,250 kW
Tonelaje: 4,000 tph
Tension: ST-1900 N/mm
Velocidad: 5.5 m/s
Material: Iron Ore

Chute Design
Project scope included chute design and DEM analysis for two chutes on a system conveying iron ore, each with capacity up to 2,000 tph.
Number of Chutes: 2
Chute Design: Yes
ROCKY DEM Analysis: Yes
Tonelaje: 2,000 tph

Interesting Features:

  • Feed chute design for Voest-Alpine.
Scroll to Top