Safford Project

Safford Project services included static analysis, dynamic analysis, instrumentation, and commissioning.

Año de construcción: 2008
Ubicación: Safford, Arizona, USA
Length : 2.17 km
Potencia: 900 kW
Tonelaje: 6,500 tph
Tension: ST-1200 N/mm
Velocidad: 4.1 m/s
Material: Copper Ore

Interesting features:

  • 2.2 km downhill conveyor with mobile tripper
  • Silo, 2 discharge conveyors, and rotary acid spray drums
  • Feed conveyor; Portable conveyor system with Rotary Stacker



Scroll to Top