Quintette Project
Jiangxi Project Design included mechanical design and control design of a 2.9 m conveyor.


Previous
Next
Año de construcción: 1986
Ubicación: Quintette Mine, Tumbler Bridge, BC, Canada
Length : 19.0 km
Potencia: 6,111 kW
Tonelaje: 2,200 tph
Tension:
Velocidad: 6.0 m/s
Material: Coal
Interesting Features:
- Redesign of brake (existing brake proportional control caused runaway). Replaced with very fast acting hydraulic disk brake (70 msec)
- Pulley re-design (corrected drive pulley design flaw)