PECEM Project
PECEM Project Design included belt design, power analysis, belt tension analysis, dynamic analysis, and chute design.
Año de construcción: 2011
Ubicación: PECAM-CIPP Brazil
Length : 5.7 km
Potencia: 4,120 kW
Tonelaje: 2,500 tph
Tension: ST-1600 N/mm
Velocidad: 5.0 m/s
Material: Coal
Chute Design
Project scope included chute design and DEM analysis for one chute in a system conveying coal up to 2,500 tph.
Number of Chutes: 1
Chute Design: Yes
ROCKY DEM Analysis: Yes
Tonelaje: 2,500 tph
Interesting Features:
- 600 mm diameter ST-1600 pipe conveyor, two flights.