Neptune Terminals Project
Neptune Terminals Project Design included mechanical design of a 160 m pipe conveyor. Additional Forensic work in 2015.


Previous
Next
Año de construcción: 2011
Ubicación: Neptune Terminals – Vancouver, BC, Canada
Length : .160 km
Potencia: 372 kW
Tonelaje: 3,500 tph
Tension: ST-800 N/mm
Velocidad: 4.3 m/s
Material: Potash
Additional Work at Site
Projects on site after initial project completion | ||
Year: | Type: | Scope Description |
2015 | Forensic Analysis | Forensic analysis for high abrasive wear on the belt edge of the inner belt overlap. |