Mutuca Project
Mutuca Project Design services included mechanical design, dynamic analysis, specification of all major equipment, brake system design, instrumentation, and control system design. The control system design included the logic development and programming (Allen Bradley PLC5/30), supervisory system (FactoryLink) development and programming, on-site commissioning, and performance testing.
The project is a 3.6 Km route at 3300 TPH for the transportation of iron ore consisting of one overland, two downhill and four plant conveyors. It also included two silos, one feeder system, and interfacing to the stacker / reclaimer systems. |
Previous
Next
Año de construcción: 1995
Ubicación: Mutuca, MBR, Brazil
Length : 3.551 km
Potencia: 2,100 kW
Tonelaje: 3,200 tph
Tension: ST-2400, ST-1300, and ST-1680 N/mm
Velocidad: 4.65 m/s
Material: Iron Ore
Interesting Features:
- DC drives on downhill and overland conveyors.
- Fluid couplings on plant conveyors.