IronOre Canada Project

IronOre Canada Project services included tension control analysis and upgraded control logic.

Año de construcción: 2015
Ubicación: Labrador City, NL, Canada
Length : 6.062 km
Potencia: 4,800 kW
Capacity: 6,000 tph
Tension: ST-2500 N/mm
Velocidad: 6.0 m/s
Material: Iron Ore

Interesting Features:

  • -48ºC to 30ºC Temperature range
  • Unusual tail drive control to control tension in horizontal curves
Scroll to Top