Ingwe Project
Ingwe Project Design services for this 14 km overland, curved conveyor included: mechanical design, controls, head tail drive, and downhills.




Previous
Next
Año de construcción: 2000
Ubicación: South Africa
Length : 13.358 km
Potencia: 2,205 kW
Tonelaje: 1,800 tph
Tension: ST2200 / ST1100 N/mm
Velocidad: 5.0 m/s
Material: Coal
Interesting Features:
- 1050 mm, 3 downhill with horizontal curve, 3 flights, brakes