Essroc Project
Essroc Project Design included mechanical design, control design, and chute design(3). New control system with an upgraded mechanical design. Additional Forensic work done on site in 2015.
Previous
Next
Año de construcción: 2010
Ubicación: Essroc – Allentown, PA
Length : 2.734 km
Potencia: 900 kW
Tonelaje: 1,000 tph
Tension: ST-700 N/mm
Velocidad: 3.3 m/s
Material: Limestone
Interesting Features:
- By-way conveying mid-station drive.
- 400 m horizontal curve.