Elk View Project
Elk View Project Design included forensic analysis on runaway conditions due to brake failures, control design, upgraded brake system, upgraded across-the-line start to a synchronized soft-start system, and commissioning.








Previous
Next
Año de construcción: 2010
Ubicación: Calgary, BC, Canada
Length : 2.503 km
Potencia: 1,500 kW
Tonelaje: 1,650 tph
Tension: ST-2400 N/mm
Velocidad: 3.49 m/s
Material: Coal