Dangote Project
Dangote Project Design, in Nigeria, included mechanical and control system engineering through commissioning, 4 chutes, and an elevated with maintenance car.









Previous
Next
Line 2:
Año de construcción: 2006
Ubicación: Nigeria
Length : 6.903 km
Potencia: 1,500 kW
Tonelaje: 2,400 tph
Tension: ST-1200 N/mm
Velocidad: 5.0 m/s
Material: Limestone
Line 3:
Año de construcción: 2012
Location: Nigeria
CDI Scope: Mechanical engineering
Length : 7.7 km
Potencia: 1,500 kW
Tonelaje: 3,500 tph
Tension: ST-1200 N/mm
Velocidad: 5.0 m/s
Material: Limestone
Line 4:
Año de construcción: 2014
Location: Nigeria
Length : 10.0 km
Potencia: 2,130 kW
Tonelaje: 1,950 tph
Tension: ST-1800 N/mm
Velocidad: 5.0 m/s
Material: Limestone
Interesting Features:
- Horizontal curve with 1 flight; Elevated with maintenance car