Dangote Cement- Obajana Line 4
Following our success designing lines 2 and line 3, CDI was hired to design Line 4. Our scope included route optimization, basic engineering of the mechanical system, chute design, triangular gallery structural analysis, and motorized maintenance trolley design.
Año de construcción: 2015
Ubicación: Nigeria
Length : 10 km
Potencia: 2130 kW
Tonelaje: 1950 tph
Tension: ST-1800 N/mm (both conveyors)
Velocidad: 5.0 m/s
Material: limestone
Interesting Features:
- Elevated Triangular Galleries
- No walkways, the conveyor is maintained with a powered trolley