Dangote Cement- Obajana Line 3
Following our success designing lines 2, CDI was hired to design Line 3. Our scope included route optimization, basic engineering of the mechanical system, chute design, triangular gallery structural analysis, and motorized maintenance trolley design.
Año de construcción: 2012
Ubicación: Nigeria
Length : 7.7 km
Potencia: 1500 kW
Tonelaje: 3500 tph
Tension: ST-1200 N/mm (both conveyors)
Velocidad: 5.0 m/s
Material: limestone
Interesting Features:
- Elevated Triangular Galleries
- No walkways, the conveyor is maintained with a powered trolley