Dahej Project

Dahej Project Design included mechanical design, control design, component selection, commissioning, and chute design from the Dahej Port to Silo System.

Año de construcción: 2013
Ubicación: Dahej Port, India
Length : 3.76 km
Potencia: 4,100 kW
Tonelaje: 6,000 tph
Tension: ST-1000 N/mm / ST-1250 N/mm
Velocidad: 7.5 m/s / 4.15 m/s
Material: Coal

Chute Design
Project scope included chute design and DEM analysis in a system conveying coal up to 6,000 tph.
Number of Chutes: 3
Chute Design: Yes
ROCKY DEM Analysis: Yes
Tonelaje: 6,000 tph

Interesting Features:

  • 36 m spans with elevated truss.
  • Maintained with a motorized trolley.