Collahuasi Project
Collahuasi Project Design included mechanical design audit, chute designs (4 chutes) joint venture with Krupp, and provided control system logic. Additional Forensic work done on site in 2009 and 2011.
Año de construcción: 2003
Ubicación: Collahuasi Project, Chile
Length : 3.284 km
Potencia: 14,400 kW
Tonelaje: 11,400 tph
Tension: ST-2550, ST-4400 N/mm
Velocidad: 6.5 m/s
Material: Copper Ore
Chute Design
Project scope included chute design and DEM analysis for four chutes, each with capacity up to 8,500 tph.
Number of Chutes: 4
Chute Design: Yes
ROCKY DEM Analysis: Yes
Tonelaje: 8,500 tph
Additional Work at Site
Projects on site after initial project completion
2009 Forensic Analysis Forensic testing to determine cause of VFD failures on Conveyor 203 at the Campania Minera Dona Ines de Collahuasi mine. The protection system did not function correctly, allowing severe electrical damage to all the VFD’s.
2011 Forensic Analysis Forensic testing to determine cause of belt failure on Conveyor 205 at the Campania Minera Dona I