Collahuasi Project
Collahuasi Project Design included mechanical design audit, chute designs (4 chutes) joint venture with Krupp, and provided control system logic. Additional Forensic work done on site in 2009 and 2011.
Previous
Next
Año de construcción: 2003
Ubicación: Collahuasi Project, Chile
Length : 3.284 km
Potencia: 14,400 kW
Tonelaje: 11,400 tph
Tension: ST-2550, ST-4400 N/mm
Velocidad: 6.5 m/s
Material: Copper Ore
Chute Design
Project scope included chute design and DEM analysis for four chutes, each with capacity up to 8,500 tph.
Number of Chutes: 4
Chute Design: Yes
ROCKY DEM Analysis: Yes
Tonelaje: 8,500 tph
Interesting features:
- Downhill horizontal curves