Bulgaria Project

Bulgaria Project Design included belt design and system evaluation for a 2.7 km pipe conveyor.

Año de construcción: 2010
Ubicación: Maritsa Power, Bulgaria
Length : 2.7 km
Potencia: 1,000 kW
Tonelaje: 910 tph
Tension: ST-1100 N/mm
Velocidad: 4.0 m/s
Material: Coal

Interesting Features:

  • First Low Rolling Resistance Confine Steel Cord Pipe belt.
Scroll to Top