BHP Bi-Way Project
BHP Bi-Way Project – Services for this 8.5 km curved, overland system included feasibility, design audit, tunnels, and head tail drive.
Año de construcción: 1996
Ubicación: Port Hedland, Australia
Length : 8.5 km
Potencia: 2,700 kW
Tonelaje: 4,000 tph
Tension: ST-2000 N/mm
Velocidad: 6.2 m/s
Material: Iron Ore