Aqaba Project
Aqaba Project services included mechanical redesign, full system control design, and commissioning with fully automated stacking and reclaiming equipment.
Stacking System
– 6 plant conveyors, 900 TPH
– 7 feeder conveyors, 4 truck dump hoppers
– 2 diverters, 3 Silo, 3 dust systems
– 3 mobile stackers w/ 2 conveyors and hydraulic boom control
Reclaiming System:
– 11 plant conveyors, 1000 TPH
– 8 diverters, 1 screen, 9 dust systems
– 7 remote plant conveyors w/ 4 diverters, 2 shiploaders
– 2 mobile reclaimers w/ 3 chains and 3 2-speed winch motors
Previous
Next
Año de construcción: 2009
Ubicación: APC – Aqaba, Aqaba, Jordan
Material: Potash